A budget alert turns cost attribution into an operational safeguard: it notifies a team when tracked or projected spending approaches a defined limit. Alerts belong in the observability layer, where generation costs already carry dimensions such as team, workflow, and model. section 7.6.2
Configure each alert with four dimensions:
- Progressive thresholds, such as warning at 70%, escalation at 90%, and paging at 100%. section 7.6.2
- A scope covering a team, workflow, or application. section 7.6.2
- A reporting period such as daily, weekly, or monthly. section 7.6.2
- One or more delivery channels, including Slack, email, or PagerDuty. section 7.6.2
Projected monthly overage
After 15 days, a team has consumed 60% of its monthly budget. A projection estimates 120% usage by month end, triggering an early warning while optimization is still possible. Cost reports can then narrow from team to workflow to model, exposing the dominant spending dimension. section 7.6.2
Treat alerts as visibility, not enforcement. Blocking requests after a threshold can break production applications; hard limits belong to rate limiting. Alerts explain emerging spend, while rate limits enforce request constraints. section 7.6.2
