A promotion workflow controls when a tested artifact may advance from pre-production to production. A successful test alone may not be enough: Checkout added a two-hour soak to catch problems that emerge only under longer-running traffic. section 2.2
A production gate can check that:
- The latest completed pre-production test suite passed. section 2.2
- The version has remained in pre-production for at least two hours without replacement. section 2.2
- An eligible version triggers a pull request for a teammate to approve and merge. section 2.2
Figure 2.1 Checkout’s promotion layer after the test gate, the soak, and the scheduled trigger. Every five minutes a GitHub Actions workflow asks Argo CD what pre-prod is running and for how long, checks the latest completed run of the pre-prod test suite, and, if the version is eligible, opens a pull request that a teammate approves and merges. The numbered labels are explained in the text.
The diagram traces the scheduled checks from Argo CD and the test suite to a pull request requiring teammate approval. section 2.2