A Kaizen burst marks a deliberate intervention on a specific constraint in a value stream. It targets a delay that governs lead time, rather than speeding up a step that does not limit the overall flow. section 6.1.2
Use the value stream to choose and test an intervention:
- Find the longest structural delay and ask whether it is necessary, capacity-based, schedule-based, batching-based, or tooling-based. section 6.6
- Choose a small change aimed at that delay. Examples include limiting review work in progress to three pull requests, scheduling daily review blocks, or deploying on merge. section 6.1.2
- Try the change on the next feature, then compare lead time, activity ratio, and queue depth. If the constraint moves, map the new flow and repeat. section 6.6
Figure 6.6 A feature value stream that shows typical delays that contribute to a low activity ratio.

A feature value stream map makes typical delays visible, helping identify where a focused intervention might improve flow. section 6.1.2