The time and space assembly line balancing problem (TSALBP) assigns each task to one workstation while respecting precedence, cycle-time, and available-space constraints. It extends simpler assembly line balancing by modeling realistic station-layout limits. section 6.6
Common TSALBP objectives include:
- Preserve task order in the precedence graph while keeping each station within workload and space limits. section 6.6
Bike assembly
A bike line must install forks and handlebars after assembling the frame, then attach wheels after the frame and forks. A precedence diagram records these dependencies. section 6.6
