liveBook · Manning

Time scale

As explained in Experimentation for Engineers

The duration required to obtain an individual measurement of a metric or to observe a relevant outcome.

A time scale is the duration required to obtain one individual measurement or observe a relevant outcome. It shapes how quickly experiments can produce reliable aggregate metrics: slower measurements require longer experiments. section 7.2.3 section 1.1.2

For an aggregate measurement, the required number of individual observations increases with measurement noise and with the precision demanded by practical significance: num_ind >= (2.48 * sd1_delta / prac_sig)^2. Doubling noise quadruples the required observations. section 7.2.3

Use time scale to anticipate experimental and operational constraints:

  • Fast measurements, such as web-server latency, support rapid iteration. section 7.2.3
  • Slow measurements, such as monthly unique users, can make experiments impractically long. section 7.2.3
  • Trading strategies require predictors and risk understanding suited to their holding period, from seconds through months. section 1.1.2

Latency versus user activity

A web-server response can be measured in tens of milliseconds, while daily active users require a day-scale observation. Both can support business evaluation, but the latter constrains rapid experimental iteration. section 7.2.3

How Experimentation for Engineers covers it

How deep it goes
Explains measurement duration, noise, precision, and sample-size effects, but stops short of prescribing experiment stopping rules.
Examples
Compares server latency, page loads, click-through rate, daily active users, FPGA processing, and trading holding periods.
What it assumes
Assumes familiarity with aggregate measurements, experiments, standard deviation, and practical significance.
What you can do after
Evaluate experiment feasibility by estimating observation counts, noise effects, precision costs, and metric-driven iteration speed.
How it connects
Connects business metrics and A/B testing with measurement noise, practical significance, predictive models, and trading risk.

Also explained in

Compare how 2 books explain time scale →

Related concepts

This explainer was generated by Manning's knowledge graph from the text of Experimentation for Engineers. The section links point to the parts of the book it draws on.