Risk tolerance is the level of risk an organization is willing to accept in a particular business area, process, or activity. It sits within risk appetite: the broader amount of risk the organization is willing to take in pursuit of its goals. A risk acceptable in one activity may be unacceptable in another. section 2.4 section 2.2.2
Downtime depends on the activity
A hospital cannot tolerate system downtime in the same way a sports club can. The consequence of an outage helps determine whether the risk needs action or can be accepted. Accepting downtime for a non-critical service may be reasonable when it falls within defined limits. section 2.2.2 section 2.2.3
|
Risk Level
|
Risk Rating
|
Meaning
|
|
1 (Very
High)
|
Unacceptable
|
Immediate
action required. Activity must stop until the risk is reduced or avoided.
|
|
2 (High)
|
Undesirable
|
Risk above
acceptable threshold. Requires treatment with defined
controls and timeline.
|
|
3 (Medium)
|
Moderate
|
Acceptable
with formal approval. Requires justification and monitoring.
|
|
4 (Low)
|
Acceptable
|
Within
acceptable limits. No additional controls required; monitor as needed.
|
The risk-rating table illustrates decision bands: very high risks require immediate action, while medium risks may be accepted with formal approval and monitoring. These bands help turn an assessed risk into a decision; an organization still needs criteria suited to its activities. section 2.2.2
Risk tolerance does not mean eliminating every risk. Once a risk is assessed, the organization can reduce it with controls, avoid the activity, transfer some exposure, or formally accept it within defined limits. Treatment should bring risk to a tolerable level without costing more—in money or operational impact—than the benefit warrants. Any risk remaining after treatment must be evaluated for acceptance or further action. section 2.2.3 section 2.3