When planning a project, start with the full scope of work. A work breakdown structure (WBS) divides that scope into smaller, manageable work packages, typically shown as a tree with the main deliverable at the top and more detailed tasks below. section 10.1.3
Use the breakdown to move toward a plan:
- Identify the work packages needed to deliver the goal. section 10.1.3
- Sequence the tasks and add milestones and timelines. WBS maps what work exists; a working-backward plan maps how to reach the goal. section 10.1.3
- Share the plan so the team understands its responsibilities. section 10.1.3