A baseline is a measurement of a process before a change, giving the team a reference for judging whether an improvement helped. Measure the friction point directly rather than relying on memory or impressions. section 15.8 section 10.1.4
For a useful comparison, choose a metric that matches the problem and record how it was measured. After making one specific change, measure the same thing the same way again, then compare. If the result improves without harming something else, standardize the change; otherwise, revert it or try another approach. section 10.1.4 section 15.8
PR review time
A team records a baseline median review time of 2.8 days across 14 pull requests. It adds automatic reviewer assignment and a four-business-hour review SLA, then measures again next sprint. The median falls to 1.1 days, supporting the decision to standardize the change. section 10.3.1